Yes Miss Kathy,
and its always makes for a easy cut out when they are going to doze the building down as soon as the bees are gone so the dozer operator does not get ate up. The only draw back was carrying the equipment in and out of the building te floor kept falling through! Thank goodness for the old semi rotten carpet.... when I heard the cracking of plywood I kicked in the ole hillbilly quick step.. :pinkelephant:..kept me from going all the way to the ground while carring a box full of bees.